Alma Station
Menlo Park, CA
INDOOR/OUTDOOR CONNECTIONS  All three floors of this office building open onto large elevated terraces or ground level gardens, connecting occupants to nature. A public plaza and coffee kiosk provide a public amenity for the neighborhood and the adjacent Cal Train station.
MODERN AND CONTEXTUAL  Modern forms and proportions together with warm, high quality materials create a contemporary aesthetic that is contextual to Menlo Park.
BUILT TO LAST  Certified LEED Platinum, the building features carefully sized overhangs, trellises and window shading that minimize solar heat gain while allowing the winter sun to help warm the building when needed. .
PROJECT INFORMATION
Client: Lane Partners and Hillspire LLC  BAR Services: Architecture  Site Area: .66 Acre  Total Built Area: 25,600 gsf  Sustainability: Certified LEED Platinum  Structural: Holmes Structures  Landscape: GLS Landscape Architecture  Interior Design: BraytonHughes Design Studios  Contractor: Vance Brown Builders  Photography: BAR Architects & Interiors
RELATED PROJECTS
 
          
        
       
       
              
             
            
          
          
        
        
      
        
        
          
            
               
            
          
          
        
        
      
    
   
             
            
          
          
        
        
      
        
        
          
            
               
            
          
          
        
        
      
    
   
             
              
             
              
            